ResultsIQ › Latest results › Solarium Green Energy Ltd
Solarium Green Energy Ltd (SOLARIUM) quarterly results
NSE: SOLARIUM · BSE: 544354 · SME
AI summary: Earnings call, Q2 FY27
Earnings call of 16 Nov 2026, summarised by AI from the filing.
Gross margin fell to 21.6% from 44.4% as revenue tilted to lower-margin EPC and module sales.
Key takeaways
- Mix shift Gross margin fell to 21.6% from 44.4% as revenue tilted to lower-margin EPC and module sales.
- Order book ₹720.9 cr order book, of which EPC ₹461.1 cr and module supply ₹259.8 cr, mostly to execute in FY27.
- Receivables Trade receivables rose to ₹281.9 cr from ₹152 cr in March; bringing them down is the H2 priority.
Solarium Green Energy Ltd earnings call, investor presentation and press release summaries
Figures from the company's filings with NSE and BSE. Not investment advice.
About Solarium Green Energy Ltd
Solarium Green Energy is an integrated solar company that makes solar modules, executes utility-scale EPC contracts and installs residential rooftop solar.
What Solarium Green Energy Ltd does
Manufactures solar modules at Ahmedabad and supplies them to its own EPC contracts, residential installations and kits, with the balance sold to other contractors. Executes large single-site utility-scale EPC contracts won on its execution record; execution is contracted out on fixed terms with module supply retained. Sells residential rooftop systems directly to homeowners, handling enquiry, roof survey, design, finance, equipment, installation, net metering approval and subsidy filing. Sells Solarium-branded rooftop kits, containing 25 items with a five year insurance cover, through exclusive city distributors to independent installers.
How it makes money
- H1 FY27 revenue from operations was ₹310.47 crore, split as C&I and Government projects 47.6%, manufacturing sales 36.5%, residential 12.1% and product sales 3.7%.
- Product sales cover modules and inverters sold.
- Institutional lines (C&I and Government EPC plus manufacturing sales) earn materially lower gross margins than residential installation.
- The company says it targets 50-60% in-house consumption of module production, with EPC projects and solar kits the largest internal consumers.
Customers and markets
- Serves Indian households directly and through other empanelled vendors.
- Present in 6 states; Saarthi channel partners and city teams generate residential enquiries.
- Modules are sold to other EPC contractors and the broader B2B market, besides internal use.
- The company says it built a network of more than 450 partners across over 25 cities for solar kits, targeting installers in the PM Surya Ghar programme.
- The company says it is operational across 105+ cities in the residential rooftop segment and on-boarded 300+ partners through its Solarium Saarthi initiative.
Plants and capacity
- Miroli, Ahmedabad: Automated TOPCon and PERC bifacial solar module line, capacity 1.23 GW per annum (July 2026)
- Ahmedabad, Gujarat: Solar module manufacturing facility producing large-format G12 modules of up to 725 Wp using TOPCon cells, half-cut cells and bifacial modules, capacity 1 GW (1,000 MW) installed capacity (March 2026)
- Ahmedabad: Module manufacturing; the company said the unit was producing 4,000 modules per day with G12R wafer based technology, capacity 1.2 GW (June 2026)
Segments
- C&I and Government projects: 47.6% of revenue, H1 FY27
- Manufacturing sales: 36.5% of revenue, H1 FY27
- Residential: 12.1% of revenue, H1 FY27
- Product sales: 3.7% of revenue, H1 FY27
Key facts
- Founded: 2018 (2026)
- Headquarters: Ahmedabad, Gujarat (2026)
- Employees: 521 (September 2026)
- Team size: 350+ (30 September 2026)
- Order book: ₹720.87 Cr (EPC ₹461.06 Cr | Modules ₹259.81 Cr) (H1 FY27)
- Net worth: ₹172.9 Cr (30 September 2026)
- Listing: BSE SME: 544354; listed since February 2025 (2026)
What the company says sets it apart
- The company says own module manufacturing supplies its EPC contracts, residential installations and kits, which secures supply and retains margin within the group.
- The company says its 1.23 GW line at Miroli, Ahmedabad was enlisted on ALMM List-I in July 2026.
- The company says its 25-item branded kit with a five year insurance cover is the first such product in India.
- The company says the 1 GW plant was delivered in under nine months, reflecting its execution capabilities.
- The company says it holds ISO 9001:2015, ISO 14001:2015 and ISO 45001:2018 certifications.
The company's own claims, as stated in its filings and website.
AI-written from 9 public sources; every line links its source on the page.